Introduction
Transitioning to solar energy is a smart investment, but preparing your commercial property properly ensures a smooth installation process and optimal system performance. At Surge, we guide our clients through every preparatory step to maximize efficiency, minimize disruptions, and ensure long-term success. Here’s what commercial property owners should do to get ready for a solar installation.
🏢 Assess Structural Integrity and Roof Condition
Before installation, it’s crucial to evaluate the building’s structural soundness:
Inspect the roof for wear, damage, or aging materials that may need repair or replacement
Ensure the roof can support the weight of solar panels and mounting hardware
Plan roof maintenance ahead of installation to avoid future complications
Surge partners with structural engineers when necessary to ensure safety and compliance.
📄 Gather Energy Usage Data
Understanding your property’s energy profile is key:
Collect at least 12 months of utility bills to capture seasonal fluctuations
Provide data on peak demand charges, time-of-use rates, and operational energy patterns
Identify energy efficiency improvements that can complement the solar system
This data enables us to design a system that meets your actual energy needs and maximizes savings.
🛠️ Evaluate Electrical Infrastructure
Your existing electrical system must be ready to integrate solar:
Assess the main service panel capacity to accommodate solar input
Identify any necessary upgrades to wiring, transformers, or switchgear
Plan for integrating battery storage or EV charging infrastructure if needed
Surge’s technical team ensures that your electrical infrastructure is compatible and future-proof.
🗺️ Review Zoning and Permitting Requirements
Every jurisdiction has specific regulations regarding solar installations:
Check local zoning laws and property codes for solar allowances or restrictions
Obtain required permits and approvals from local authorities or utility companies
Factor in interconnection requirements and timelines
Surge manages the entire permitting process to ensure compliance and avoid delays.
💡 Plan for Operational Continuity
To minimize disruption during installation:
Schedule work during off-peak business hours or slow seasons when possible
Communicate with tenants, employees, or stakeholders about the installation timeline
Prepare for temporary access restrictions or noise considerations
Surge provides a clear project schedule to help you coordinate effectively.
🔍 Engage a Professional Solar Partner Early
Choosing the right partner early simplifies the preparation process:
Surge conducts comprehensive site assessments and identifies any pre-installation needs
We help coordinate inspections, permits, and utility communications
Our turnkey approach means you’re supported from planning to post-installation monitoring
Working with Surge ensures a streamlined, stress-free transition to solar energy.
📝 TLDR Summary
Assess your roof’s structural integrity and address any necessary repairs
Gather comprehensive energy usage data for an accurate system design
Evaluate your electrical infrastructure for compatibility with solar and storage
Understand and comply with local zoning, permitting, and interconnection rules
Plan for operational continuity to minimize business disruptions
Partner with Surge early for expert guidance and seamless project execution